Massachusetts
Working at the Cabot hydroelectric generating station, owned by FirstLight Power Resources, TRC completed engineering services to replace the entire plant’s protective relay equipment.
Between October 2018 and June 2019, our electrical engineers replaced the original existing electromechanical protective relays with state-of-the-art Schweitzer Engineering Laboratories (SEL) microprocessor relays. The relay replacements covered the hydro station’s six generators (including stator ground protection), two station buses, generator step-up transformer and the station service transformer.
We provided all the necessary design drawings to complete the project at the facility and provided protective relay settings and proper relay coordination for all the new relays that were installed, including detailed setting basis documents, relay setting calculations, and relay setting file development.
As a result, the station’s aging electromechanical relays was upgraded with modern digital protection relays, increasing flexibility, security and reliability, while reducing required maintenance activities.
Related Projects
Site Design and Permitting – Virginia Military Institute Aquatic Center
TRC supported the permitting and compliance required to build a new 58,000 square foot Aquatic Center.
Transmission Project Environmental Assessments and Permitting
Strengthening the reliability of the downstate New York power grid
- Electric Utilities
- Electrical and Power Engineering
- Environmental Assessment, Permitting and Compliance
Mohican-Battenkill Transmission Line Rebuild and Reconductoring
TRC is providing environmental and agricultural inspection support
Chapin Beach Coastal Resilience Improvements
Protecting the roadway from erosion and storm damage.
Bayonne Energy Center Project & Submarine Cable
TRC supports the development of a 512 MW electric generating facility on a brownfield site and a 6.5-mile submarine electric …
Sharing Our Perspectives
Our practitioners share their insights and perspectives on the trends and challenges shaping the market.
Webinar Replay: Substation Automation – Best Practices for IEC 61850 Implementation
March 29, 2022
Modernizing utility equipment, standards and processes pays dividends for improved safety, security and reliability. But transitioning to a new high-tech system model can be challenging.
The Best Process for Transforming Thermal Generation Power Plants
February 9, 2022
Faced with an aging fleet, stricter environmental regulations, reduced costs for natural gas and competition from renewables, more than 600 power plants have been decommissioned in the last 20 years, a pace that will increase with the announced closure of nearly 350 additional plants by 2025.
Amplifying the Next Phase of Fleet Electrification: The Pickup
September 30, 2021
TRC’s analysis for one client fleet shows that even a $70,000 EV can compete on cost with a comparable gas-hybrid vehicle priced at $40,000 – at least in California where upfront and ongoing incentives stack up quickly.
TRC Acquires Montreal’s Quatric, Expanding Digital Capabilities for Utilities
June 16, 2021
Today, TRC announced the expansion of its digital capabilities with the acquisition of Quatric, a Montreal, QC and Quincy, MA-based firm that provides engineering services and technology solutions to electric and gas utilities.
NERC Addresses Single Points of Failure in Protection Systems Among Other FERC Concerns
October 25, 2018
In a world where energy supply and consumption are becoming increasingly dynamic and complex, energy providers are still expected to maintain a standard of safe, reliable and resilient power delivery. Distributed energy resources (DERs) – small-scale units of local generation connected to the grid at the distribution level that often include battery storage, electric vehicles (EVs), EV charging stations and residential solar – and associated business models are proliferating at a staggering rate. Traditional utility customers are transitioning from interacting with consumers to networking with prosumers, and utilities are facing pressure to become more sophisticated as policymakers push to shrink carbon footprints. Under this lens, traditional utility planning tools are insufficient. These tools have not fully embraced the potential or the expansion of DERs within power networks, where the increased penetration of DERs has the capability to wreak havoc on grid resiliency. Whether it be photovoltaic plus battery storage or EVs and fleet charging, it is imperative to be able to assess the locational impact of each resource in a timely manner. Traditional planning tools leverage a brute force method, requiring a significant amount of an engineering time to conduct one-off studies. But dynamic network tools that quickly model parallel simulations become a necessity to validate load flow calculations and understand the dynamic hosting capacity on areas of the network. Planning tools need to become more automated and integrate better with the utility’s back office systems to help reduce the time required to conduct an engineering analysis. For certain utilities, using traditional tools to validate the network model and load flow calculations could require four to six hours per circuit, and in some cases more than 20 hours. Multiply that by 1,000 circuits – as well as adding in the complexity of optimization-based problems such as DER location, storage dispatch and hosting capacity – and utilities are faced with a significant amount of time required just to conduct the studies, let alone being able to use the results.
TRC Expands Presence in Power Market with Acquisition of Ohio-based IJUS
October 1, 2018
LOWELL, Mass. – TRC, a leading provider of end-to-end engineering, consulting and construction management solutions fueled by innovative technology, announced today it has acquired IJUS, a top power/utility engineering firm based in Gahanna, Ohio. Terms of the deal were not disclosed.
TRC and partners win $1 million grant for engineering innovative New York microgrid
April 20, 2017
TRC is proud to support Huntington, NY bolster power reliability and climate-change resiliency with a sophisticated new “community microgrid’’ combining solar energy, a fuel cell, biogas and traditional natural gas to deliver electricity and heat to local customers and institutions.
Download Whitepaper: 10 Years of Insights for Clean Community Microgrids
March 1, 2023
Clean, community microgrids represent a promising and timely opportunity for you to advance your customer offering and deliver meaningful societal benefits, all while modernizing your grid and providing you with load flexibility.
Start Your Batteries: Mass Fleet Electrification is Coming (And What We Can do to Prepare)
April 13, 2022
As we plan for and make early investments for fleets, we’ll be paving the way for higher degrees of market penetration of passenger vehicles and other modes of transportation as well.
Ensuring a Just Transition: Optimizing Opportunities for All in the Low-Carbon Future
January 24, 2022
Carbon elimination of the magnitude needed to address climate change requires systems-level change that can only be reached by incremental, ground-up progress, building upon what we have achieved thus far.
10 Takeaways from the COP26 Climate Meeting
November 17, 2021
There are compelling reasons to be optimistic about the outcomes of the COP26 meeting. Notably, agreement among all nations that more needs to be done, by both private and governmental bodies, to contain and mitigate climate change.
Amplifying the Next Phase of Fleet Electrification: The Pickup
September 30, 2021
TRC’s analysis for one client fleet shows that even a $70,000 EV can compete on cost with a comparable gas-hybrid vehicle priced at $40,000 – at least in California where upfront and ongoing incentives stack up quickly.
TRC Acquires New Jersey’s Clean Energy Program Contract and Assumes Program Administrator Role
January 17, 2021
NEW BRUNSWICK, NJ and LOWELL, MA. – Jan. 17, 2017 – TRC Companies Inc., a recognized leader in engineering, environmental consulting and construction-management services, today announced it has acquired the contract to serve as Program Administrator of New Jersey’s Clean Energy Program™ (NJCEP), which has provided more than $300 million annually in support to homeowners, businesses…