Maguire Road Substation TRC provided permitting, design, procurement and construction services for this project to improve the reliability and capacity of the transmission … Read More
Waterside Generating Station Demolition and Abatement TRC’s RE Power team assumed full responsibility for the physical decommissioning of these properties located in Manhattan. Read More
Permitting for 65 Wind Turbines TRC provided extensive field surveys in support of federal, state, and local permits and approvals for the Laurel Mountain Wind … Read More
Development of Best Management Practices for Electric Transmission Line Integrated Vegetation Management and O&M Activities TRC led the development of BMPs to protect threatened and endangered species and promote general wildlife habitat and plant biodiversity … Read More
Storm Water Management for Electric Transmission Project TRC was retained by Vermont Electric Power Company (VELCO) to delineate all natural resources in the project area and obtain … Read More
Keene Road Substation TRC supported this Bangor Hydro-Electric Company project by performing engineering, design, project management and construction management for the construction of … Read More
3rd Party FERC EIS for LNG Terminal TRC prepared a Third-Party Environmental Impact Statement on behalf of the FERC which was needed to fulfill the requirements of … Read More
Pre-construction Avian Studies and Eagle Nest Surveys Throughout the project, TRC coordinated closely with the relevant regulatory agencies including USFWS to update them on the study design … Read More